Safety / Stop authority
A hold is
part of the job.
An unresolved question about structure, material or boundary places the affected work face on hold.
Unexpected movement
Structural movement outside the agreed lift sequence: lower the load if safe, isolate the area and request a revised sequence. A revised sequence requires new sign-off before that work continues.
Unidentified service or material
Stop disturbance, preserve the location record and seek identification. An unrecorded live service or mismatched hazardous-material record is not resolved by assuming it matches the neighbouring work face.
Permit or boundary mismatch
Keep personnel outside the disputed area until the responsible holder resolves it. A project boundary does not grant entry to all ground or the interior of a retained shell.
Retained structures / Continuing inspection
Retained is still
a structure.
Inspection access, wall stability and falling material need a plan after nearby roofs have gone. A photograph of open ground does not make the interiors accessible.
Reserve 9 retains three brick shells. Two remain closed for inspection. A named escorted-corridor permit does not include entry to a closed shell.
Check the access scopeNear miss / Record requirements
Record the change.
Keep the uncertainty.
Record location, work face, sequence step, observed change, immediate action and who received the notice. Keep the original record when a correction is appended. Report uncertainty rather than filling a missing time with an assumed one.
The record should let the next person understand where work stopped, which condition remains unresolved and what is missing before resumption. The record itself does not replace a revised sequence or the responsible sign-off.