Know the material
Preserve identity, origin and condition before a route is assigned.
Materials & ecology / Continuing responsibility
Recovered components, recycled materials and ecological observations each need their own outcome record.
Material routing / Record chain
Preserve identity, origin and condition before a route is assigned.
Reuse, recycling and disposal remain separate decisions.
The receiving location belongs in the same material record.
Acceptance completes the route. A sorted pile is not the end.
This is a record workflow, rather than a live logistics board. No recovery rate or outbound tonnage is published here.
Record needed
Component identity, condition, receiving location and documented acceptance.
Outcome boundary
A removed component is not a completed reuse result until the recipient accepts it.
Record needed
Declared stream, destination and the receiving record.
Outcome boundary
An outgoing weight cannot stand in for the final destination.
Record needed
Baseline, follow-up method, season and observation limits.
Outcome boundary
Visible green ground does not quantify diversity or certify stable seasonal water conditions.
Reserve 9 / Continuing questions
The visible river, mixed vegetation and remaining shells describe the ten-year site. They do not quantify species diversity or guarantee that every seasonal water condition is stable. Continued inspections cover drainage, ground condition and retained structures.
Preserving a wall can carry long-term maintenance costs; removing it can erase useful space and a material record. The project register retains that choice rather than treating more removal as automatically more ecological.
NC-REGISTER-2149 is the company register as of 2149-12-31: 1,432 distinct town locations with at least one closed rewilding work package. The current total is unknown. It establishes neither whole-town clearance nor independent ecological certification.